HV Duct Route, Inchicore

This project entailed the construction of 8.5km x 10-way and 4-way ducts for 110kV cables and other services; construction of 19No. x 6m x 2.5 x 2m in situ concrete chambers; 3No. crossings of Grand Canal with 20-way duct lines by damming and flume pipe methodology;
Other Services:
400m x 900mm (and 2-way x 900mm) diameter surface water drainage lines; precast concrete culvert with headwalls & aprons at each end; diversion of 2.6km of ESB 10kV services (4-way duct); diversion of watermain, 400mm di. x 1.1km long; various other services.
- Client: ESB Networks
- Completion Date: August 2010
- Value: €12.3m